PO number ADMIN3943. Overnight? 4No Specialist waste water engineers on site for up to 8 hours 2No specialist lifting frames Tanker to empty up to 4000g Extra high pressure jetter on site for up to an hour 2No Replacement bearings 1No Top sprocket 1No Bottom sprocket 1No Drive chain 2No greasomatics 2No grease to bearings adapters Following on from our recent site visit, our engineer has advised that further works are required on your sewage system.
Remedial Parts Moniton Junction Box (240x190x90) KSB Amarex ARX F080-180/017F4YSG -170 c/w 10m power cable Old claw to be fitted to new pump. Stonegravels
Thank you for your recent enquiry regarding a support for your off mains drainage system, please see below for our quotation and what this includes. Everything you need to get a selection of quotes from tradespeople and suppliers for your project to deliver a compliant system, including: • Site survey (one number) • Plan view schematic of proposed solution indicating pipework, cabling, equipment locations • Local Source Protection Zone (SPZ) map • Specialist equipment options sized and specified accurately (i.e. tank(s), pump station(s), control panel) • Buildings control / regulations requirements • Hydraulic levels schematic • Unit specifications and costs for supply • Full bill of materials including bulk product estimates (concrete, gravel, pipework) and equipment costs • Project coordination assistance for materials delivery • Manufacturer installation guides and instructions • Service Contracts to provide the building control officer Additionally with a Detailed Pack the team will provide x2 one hour zoom, WhatsApp or telephone calls to answer questions and provide assistance for you or your groundworker team.
Full Address: Ranksborough Hall, Langham, Oakham LE15 7EJ, UK
Site: Ranksborough Hall
Equipment: Pump Station
Description:
Go ahead received but still awaiting PO - would like to book for March time** Site address: Ranksborough Hall, Langham, Oakham LE15 7EJ 1No New 3 phase control panel with pump run and warning lights (as per Rob email 29/1, use panel labelled Haythorne) 1No External red beacon to suit 1No New Isolator Up to 2m of new cable 2No New float brackets 4No Control floats 1No Waste water Engineer on site for up to 4 hours
Full Address: High St, Newington, Sittingbourne ME9 7JJ, UK
Site: 107 High Street
Equipment: Single Crude Pump Station
Description:
Following our engineer’s recent site visit, please find the quotation below for the replacement of the floats within the pump station, as well as the installation of a new control panel and beacon.
Site address: EKFB Greatworth Green Tunnel Compound, Culworth, Banbury OX17 2HL 8No Bearing greasomatics 1No New Sludge return pump Tanker to remove up to 10000 gallons Up to 2 hours of high pressure jetting 2No Waste water Engineers on site for up to 3 hours
ON HOLD UNTIL AT LEAST MARCH AS AREA NEEDS TO BE CUT DOWN FIRST Tanker to remove up to 2000 gallons with up to 80m of hose lay High pressure jetter on site for up to 1 hour 2No Waste water Engineers on site for up to 2 hours