Full Address: Chapel-en-le-Frith, High Peak SK23 0QU, UK
Site: Chapel En Le Frith
Equipment: BIOPure Secon
Description:
NS - Please advise if desludge is due Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Scotter Rd S, Scunthorpe DN17 2BN, UK
Site: Silica Lodge Garden Centre
Equipment: WPL 75 Pop
Description:
SSC - Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Ripponden, Sowerby Bridge HX6 4NN, UK
Site: Macpelah House
Description:
booked for AM - SSC - Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Cliftonthorpe, Ashby-de-la-Zouch LE65 2US, UK
Site: Cliftonthorpe - B1113
Equipment: Klargester B9
Description:
Callout - System is showing loss of rotation but is actually rotating. Please take all parts with you from remedial shelf as per Shaun. Make sure you list what has been used so we can invoice accordingly. Any issues please do call Shaun or Rob
FOC return trip - F6 fault on the system again but everything sounds like it's working. Please check sesor,magnet etc. Knock on door and speak to Jo before you start working. Booked for AM
Full Address: Sister Dora Gardens, Walsall WS1 3NY, UK
Site: Sister Dora Gardens
Equipment: Pump Station - Gate code - C789XZ SSC
Description:
2 x new Zenit DGI 100/4/80 A0CM5 230v, 0.74, 5.50 amps 4 x orange floats 10 m 1 m 50 x 50 angle 3 x M8 through bolts - Pick up bolts from screwfix etc if none on van Tanker - Camion Purchase Order: 007489 Jetter 2 Man 3 hours
Call out to your foul pump station Call out will include supply and fit of new pump , lifting chain and D links Customer will supply tanker to empty the levels to allow us to work Includes one hour onsite. Calpeda GMV 50-65C Pump Galvanised Lifting Chain (per 1m) D Links
Booked 8am - PLEASE SIGN IN AND OUT AT RECEPTION - IMPORTANT. 2No Engineers on site for up to three hours 1No replacement pump 2No sets of twin guide rails 2No top brackets Fixings for top brackets and new metal work Aluminium cross member
Full Address: Ulley Ln, Aughton, Sheffield S26 3XU, UK
Site: Meadow View
Description:
BOOKED FOR 11-1 - NS - Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Kirklington, Bedale, North Yorkshire, DL8 2LT
Site: Kirklington Wastewater Treatment Works
Equipment: FujiClean CRX0
Description:
Site visit to assess high turbidity and show how to correctly desludge the CRX50. 1 - skim top chamber 2 2 - insert desludge hose into baffle in zone two and draw down 3 - insert desludge hose into desludge pipe in zone two and draw down 4 - skim top chamber 1 5 - insert desludge hose into baffle in zone one and draw down 6 - insert desludge hose into desludge pipe in zone one and draw down Skim final and zone 3 where required Please do manual backwash and advise if automatic desludge needs reducing
BOOKED FOR 12-2 - Service on behalf of DP&T - Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: North St, Cromford, Matlock DE4 3RG, UK
Site: Cromford Wharf Toilet Block
Equipment: TCPS - Key safe on site - Code is 1967
Description:
Site address: Cromford Wharf Quotation (2 )- For MPC Engineers to install a new control panel to a new location and wire in new floats. Before these works are able to take place a new kiosk, concrete pad, 4 inch ducting from the new kiosk into the tank and a power supply in the new kiosk are required. Parts required - 1No New Twin pump 3 phase control panel 4No New Orange floats1No New Red beacon1No Beacon cage to suit Up to 3m of new cable to take power from the power supply in the kiosk to the panel 2No Waste water Engineers on site for up to 4 hours