Full Address: Elm Dr, Chobham, Woking GU24 8PP, UK
Site: Paul Regan - 22A Elm Drive
Equipment: TCPS & Moniton
Description:
booked for first job 8-9am Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Booked for AM Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
*pending payment*** Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Plantation on Ave, Lupton, Carnforth LA6 2PP, UK
Site: Thompson Fold
Equipment: Klargester BioFicient Sewage treatment system
Description:
Please check if desludge is due - customer trying to figure out if needed 6 or 9 monthly Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Belland Ln, Ashover, Chesterfield S45 0LN, UK
Site: Belland House
Equipment: Fuji CEN7 Sewage treatment plant
Description:
**The weeks of the 17th and 23rd of Feb would be best. Installed Feb 2024 - Michelle has given him 2 free service visits 2025 & 2026 - Then send service plan** Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Meeting ET on site at 8am - PO 7211 Following on from our recent site visit, our engineer has advised that further works are required on your sewage system. The Biodisc has stopped turning due to flooding 1 no Drive chain to suit 1 no Motor gearbox to suit 1 no top sprocket to suit 1 no alarm beacon to suit 2 no waste water engineers for up to 3 hours including travel and mileage Tanker to remove up to 2000g 1 no high pressure washdown
Thank you for your recent enquiry regarding a support for your off mains drainage system, please see below for our quotation and what this includes. Everything you need to get a selection of quotes from tradespeople and suppliers for your project to deliver a compliant system, including: • Site survey (one number) • Plan view schematic of proposed solution indicating pipework, cabling, equipment locations • Local Source Protection Zone (SPZ) map • Specialist equipment options sized and specified accurately (i.e. tank(s), pump station(s), control panel) • Buildings control / regulations requirements • Hydraulic levels schematic • Unit specifications and costs for supply • Full bill of materials including bulk product estimates (concrete, gravel, pipework) and equipment costs • Project coordination assistance for materials delivery • Manufacturer installation guides and instructions • Service Contracts to provide the building control officer Additionally with a Detailed Pack the team will provide x2 one hour zoom, WhatsApp or telephone calls to answer questions and provide assistance for you or your groundworker team.
Full Address: Old Sawmill Thirlmere Keswick CA12 4TQ
Site: The Old Sawmill
Equipment: FujiClean CEN 21 Sewage Treatment System
Description:
**Please call Rob before you get to site** Quote to install the new panel as per detail in HEC ST Invoice done by Haigh Engineering The Old Sawmill - panel - Rob to test and arrange fitting
Full Address: Old Brampton Road, Baslow, Bakewell DE45 1PU, UK
Site: Robin Hood Farm
Equipment: Marsh System?
Description:
Thank you for your recent enquiry for a sewage system compliance/condition check. You have advised that you require a basic survey which includes: - Carrying out an assessment of your current tank and discharge to advise if the system is compliant including x1 hour onsite - Report on compliance of your system - Report on condition of your system - Remedial options and costs if required - Dye test of all accessible downpipes/guttering at ground level Please note that the results may be inconclusive depending on the normal working levels within the tank, access to the outlet and access to the downpipes. If you have had any issues in the past with your unit, we would recommend that you have a desludge of the system at the time of our visit as a minimum. Please speak to us if you are not sure what level of survey is required.
Morning appointment would be best. David phoned as issue with the overflow since last service. David has advised you can park on the driveway. Callout to your off mains drainage system. Includes one hour onsite. Reduction in price if only a short period of time. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Amber Cottage, Smithymoor, Stretton, Alfreton, DE55 6FE
Site: Amber Cottage
Equipment: FujiClean CEN 5 Sewage treatment system
Description:
Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.